FEASIBILITY OF ENGINEERING PROJECTS. CASE IN THE COLOMBIAN PUBLIC SECTOR
Resumen
Texto completo:
PDFReferencias
Abdellatif, H., & Alshibani, A. (2019). Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings, 9(4), 93. https://doi.org/10.3390/buildings9040093.
Adam, A., Josephson, P.-E., & Lindahl, G. (2015). Implications of Cost Overruns and Time Delays on Major Public Construction Projects. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, 747–758. https://doi.org/10.1007/978-3-662-46994-1_61.
Al-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18–24. https://doi.org/10.1016/j.proeng.2017.03.105
Alias, Z., Zawawi, E. M. A., Yusof, K., & Aris, N. M. (2014). Determining Critical Success Factors of Project Management Practice: A Conceptual Framework. Procedia - Social and Behavioral Sciences, 153, 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041.
Arantes, A., Da Silva, P. F., & Ferreira, L. M. D. F. (2016). Delays in construction projects - Causes and impacts. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1105–1110. https://doi.org/10.1109/IESM.2015.7380293.
Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), 1515–1539. https://doi.org/10.1016/j.aej.2016.03.006.
Castro Márquez, D.E., Velásquez Pérez, T. & Castro Silva, H.F. 2018. Integración de seguridad y gestión de servicios en el gobierno de las tecnologías de la información. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 32.
Castro Silva, H.F., Rodriguez Cañas, G.A. & Montes Guerra, M. (2020). Conflict Management in International Cooperation Project Teams: Perspective of a Project Manager in Colombia. En H. M.-S.-P.-U. Nelson Antonio Moreno-Monsalve, Handbook of Research on Project Management Strategies and Tools for Organizational Success (págs. 353-375). Hershey, PA: IGI Global. ISBN13: 9781799819349; ISBN10: 1799819345; EISBN13: 9781799819356. doi:10.4018/978.
Castro Silva, H.F., Rincon González, . & Montes Guerra, M. (2020). Sustainability on Project Management: An Analysis of the Construction Industry in Colombia. En H. M.-S.-P.-U. Nelson Antonio Moreno-Monsalve, Handbook of Research on Project Management Strategies and Tools for Organizational Success (págs. 281-304). Hershey, PA: IGI Global. ISBN13: 9781799819349; ISBN10: 1799819345; EISBN13: 9781799819356. doi:10.4018/978.
Catalão, F. P., Cruz, C. O., & Sarmento, J. M. (2019). The determinants of cost deviations and overruns in transport projects, an endogenous models approach. Transport Policy, 74(March 2018), 224–238. https://doi.org/10.1016/j.tranpol.2018.12.008.
Cavalieri, M., Cristaudo, R., & Guccio, C. (2019). On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. Transport Policy, 79(April), 21–36. https://doi.org/10.1016/j.tranpol.2019.04.001.
Cheng, Y. M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5), 850–860. https://doi.org/10.1016/j.ijproman.2013.10.003.
Constitución política de Colombia. (1991). Constitución política de Colombia.
Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management, 20(3), 185–190. https://doi.org/10.1016/S0263-7863(01)00067-9.
Diez Silva, H., Montes Guerra, M., & Castro Silva, H.F. (2020). Team Conflict Management in Project Management in Colombia. En H. M.-S.-P.-U. Nelson Antonio Moreno-Monsalve, Handbook of Research on Project Management Strategies and Tools for Organizational Success (págs. 49-72). Hershey, PA: IGI Global. ISBN13: 9781799819349; ISBN10: 1799819345; EISBN13: 9781799819356. doi:10.4018/978.
DNP. (2019). Plan Nacional de Desarrollo plantea inversiones por $22,1 billones para Boyacá. Retrieved from https://www.dnp.gov.co/Paginas/Plan-Nacional-de-Desarrollo-plantea-inversiones-por-22-1-billones-para-Boyaca.aspx.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.
Gobernación de Boyaca. (2014). Manual de Procedimientos del Banco Nacional de Programas y Proyectos. 1, 91–105. Retrieved from http://www.boyaca.gov.co/.
Gobernación de Boyaca. (2019). Manual de Procedimientos del Banco Nacional de Programas y Proyectos. 0, 91–105. Retrieved from http://www.boyaca.gov.co/.
Heravi, G., & Mohammadian, M. (2019). Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2019.1601394.
Jia, G., Yang, F., Wang, G., Hong, B., & You, R. (2011). A study of mega project from a perspective of social conflict theory. International Journal of Project Management, 29(7), 817–827. https://doi.org/10.1016/j.ijproman.2011.04.004.
Kerkhove, L. P., & Vanhoucke, M. (2017). Optimised scheduling for weather sensitive offshore construction projects. Omega (United Kingdom), 66, 58–78. https://doi.org/10.1016/j.omega.2016.01.011.
Khlaifat, D. M., Alyagoub, R. E., Sweis, R. J., & Sweis, G. J. (2019). Factors leading to construction projects’ failure in Jordon. International Journal of Construction Management, 19(1), 65–78. https://doi.org/10.1080/15623599.2017.1382092.
Landauer, M., & Komendantova, N. (2018). Participatory environmental governance of infrastructure projects affecting reindeer husbandry in the Arctic. Journal of Environmental Management, 223(January), 385–395. https://doi.org/10.1016/j.jenvman.2018.06.049.
Lee, C., Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), 1683–1696. https://doi.org/10.1016/j.ijproman.2017.07.011.
Ley 1150. (2007). Ley 1150 DE 2007. Retrieved from hhttp://www.secretariasenado.gov.co/senado/basedoc/ley_1150_2007.html.
Li, T. H. Y., Ng, S. T., & Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction, 29, 123–135. https://doi.org/10.1016/j.autcon.2012.09.007.
Liu, Z. zhao, Zhu, Z. wei, Wang, H. jia, & Huang, J. (2016). Handling social risks in government-driven mega project: An empirical case study from West China. International Journal of Project Management, 34(2), 202–218. https://doi.org/10.1016/j.ijproman.2015.11.003.
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice, 92, 184–194. https://doi.org/10.1016/j.tra.2016.08.007.
Martínez Ardila A.C., Carrillo Zambrano E. 2017. Arquitectura empresarial para la gestión de información de productos de desarrollo tecnológico e innovación en un grupo de investigación en Colombia. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 30.
Mendoza Bejarano, J.L., Escobar Durango, L.M. & Caicedo Villamizar, S.B. 2019. Actividades de estrategia del servicio de itil v3 como lineamiento para la gestión de servicios médicos bajo modalidad de telesalud. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 2 – Número 34.
Niazi, G. A., & Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering, 182, 510–517. https://doi.org/10.1016/j.proeng.2017.03.145.
Odeh, A. M., & Battaineh, H. T. (2001). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.
PMI. (2017). Guia de los Fundamentos para la direccion de Proyectos PMBOK (Sexta ed). Retrieved from www.pmi.org.
PMI. (2018). El éxito en tiempos de disrupción. Pulse of the Profession de PMI, 12, 32.
Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. (2019). Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction. https://doi.org/10.1108/JFMPC-04-2018-0020.
Rachid, Z., Toufik, B., & Mohammed, B. (2018). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 0(0), 1–11. https://doi.org/10.1080/15623599.2018.1435234.
Radujković, M., & Sjekavica, M. (2017). Project Management Success Factors. Procedia Engineering, 196(June), 607–615. https://doi.org/10.1016/j.proeng.2017.08.048.
Rosado Gómez, A.A., Jaimes Fernández, J.C. 2018. Revisión de la incorporación de la arquitectura orientada a servicios en las organizaciones. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.
S, Vyas Gayatri S, K. S. (2013). Performance Indicators for Construction Project 1. (1), 61–66.
Sala del Consejo Estado. (2016). Concepto Sala de Consulta C . E 1365 de 2001 Consejo de Estado - Sala de Consulta y Servicio Civil. Retrieved from https://www.funcionpublica.gov.co/eva/gestornormativo/norma_pdf.php?i=79773.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.
de O. C. (2017). Cost and time project management success factors for information systems development projects. International Journal of Project Management, 35(8), 1608–1626. https://doi.org/10.1016/j.ijproman.2017.09.007.
Senouci, A., Ismail, A., & Eldin, N. (2016). Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, 164(June), 368–375. https://doi.org/10.1016/j.proeng.2016.11.632.
Sierra, L. A., Yepes, V., & Pellicer, E. (2017). Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty. Environmental Impact Assessment Review, 67(March), 61–72. https://doi.org/10.1016/j.eiar.2017.08.003.
Tafazzoli, M., & Shrestha, P. P. (2017). Investigating Causes of Delay in U.S. Construction Projects. Investigating Causes of Delay in U.S. Construction Projects, 611–621. Retrieved from http://www.ascpro.ascweb.org.
Vanhoucke, M. (2019). Tolerance limits for project control: An overview of different approaches. Computers and Industrial Engineering, 127(May 2018), 467–479. https://doi.org/10.1016/j.cie.2018.10.035.
Velásquez Pérez, T., Pérez Pérez, Y.M. & Flórez, I.C. 2018. Adopción de prácticas de Gobierno de TI en la oficina de Admisiones, Registro y Control UFPSO. Revista Colombiana de Tecnologías de Avanzada. ISSN: 1692-7257 - Volumen 1 – Número 31.
Volden, G. H. (2018). Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway. Evaluation and Program Planning, 69(March), 109–117. https://doi.org/10.1016/j.evalprogplan.2018.04.008.
DOI: https://doi.org/10.24054/16927257.v36.n36.2020.4019
Enlaces refback
- No hay ningún enlace refback.